A post-occupancy evaluation examining the High Street CPTED Pilot in Fort Wayne, Indiana, and how coordinated CPTED improvements can support neighborhood safety, accessibility, identity, and long-term community value. The study evaluates changes associated with investments in lighting, sidewalks, pedestrian infrastructure, trees, residential properties, and neighborhood stewardship, while examining reported crime, assessed property values, environmental benefits, and the potential long-term value of the investment.

Project Information

Location: High Street, Fort Wayne, Indiana
Project Type: CPTED Neighborhood Revitalization
Completion Date: Fall 2025, Phase III
Budget: Approximately $607,000
Size: Approximately 1.3 Miles
Project Sponsor: City of Fort Wayne
Project Team: City of Fort Wayne Neighborhoods Department, Community Development, Police, Public Works, and Parks & Recreation
Post-Occupancy Evaluation: Melissa Domínguez, 2026, Dominguez Urban Strategies, LLC

Case Study Overview

The High Street CPTED Pilot in Fort Wayne, Indiana, provides an example of how Crime Prevention Through Environmental Design can be incorporated into a broader neighborhood revitalization effort. Rather than focusing on a single improvement, the project combined changes to lighting, pedestrian infrastructure, landscaping, residential properties, and neighborhood identity across multiple phases of investment.

Beginning in 2022, the City of Fort Wayne coordinated improvements along High Street and portions of Degroff Street. The approximately $607,000 initiative included pedestrian-scale street lighting, sidewalks and curb improvements, accessible curb ramps, pedestrian crossings, trees, residential lighting, neighborhood identity features, and private-property improvements. The project also involved multiple City departments and neighborhood residents, demonstrating how CPTED can extend beyond an individual site and become part of a coordinated neighborhood strategy.

From a CPTED perspective, many of these improvements directly support the relationship between the physical environment and everyday use of the neighborhood. Approximately 2,430 linear feet of sidewalks, 16 ADA curb ramps, seven new crosswalks, pedestrian signage, and curb extensions created more clearly defined and accessible pedestrian routes. Approximately 0.7 miles of pedestrian-scale street lighting and motion-activated lights at 47 homes supported nighttime visibility and opportunities for natural surveillance.

The project also addressed territorial reinforcement and neighborhood stewardship. Residents developed three neighborhood logos, an entrance sign, decorated utility boxes, light-pole medallions, and other neighborhood identity elements, while murals celebrated neighborhoods along the High Street corridor. Hamilton neighborhood residents also formed a board and organized meetings and events, creating an additional structure for community participation and continued stewardship.

One of the most significant findings examined in the post-occupancy evaluation involved reported crime. A preliminary comparative analysis by John MacDonald of the University of Pennsylvania found 40.3% lower serious reported crime on High Street relative to comparison streets during 2022–2023. The analysis used monthly serious reported crime data and comparison methods designed to examine how High Street changed relative to other areas rather than relying solely on a simple before-and-after crime count.

The available annual records also show that major reported crime remained lower through 2024. Across the supplied crime categories, the annual average declined from 34.8 incidents during the 2017–2021 baseline period to approximately 19.7 during 2022–2024. This represents a descriptive decline of approximately 43.5%, although it is important to distinguish this simple before-and-after calculation from the comparison-adjusted 40.3% finding.

The evaluation also examined whether economic conditions changed alongside the physical and safety improvements. Across a selected fixed panel of 75 High Street homes, total assessed property value increased approximately 28.7% between 2022 and 2025. A nearby comparison panel of 84 Archer Avenue homes increased approximately 26.0% during the same period. The difference is observational and does not establish that the CPTED improvements caused the additional growth, but it provides another indicator that can be monitored as the neighborhood continues to change.

Environmental improvements were another component of the project. Ninety new street trees were included in the broader planting program. Using an illustrative i-Tree model, the evaluation estimated that over 20 years those trees could absorb approximately 115,700 pounds of CO₂ equivalent, avoid approximately 72,300 gallons of stormwater runoff, and remove approximately 245 pounds of air pollutants. The modeled combined environmental value was approximately $8,644. These figures are projections based on assumed tree characteristics rather than measurements of benefits already realized.

The study went further by exploring the potential community value associated with changes in crime-related costs. Based on differences between the 2017–2021 and 2022–2024 periods, the evaluation modeled approximately $63,600 in annual victim losses, $92,500 in police-response resources, and $12,700 in court and legal resources associated with the observed differences in crime. These figures represent modeled community and public-service resource values rather than verified reductions in City spending.

Using those estimates, the evaluation developed an illustrative 20-year scenario to explore the potential relationship between the approximately $607,000 project investment and long-term community benefits. Under the featured scenario — which assumes that all modeled crime-cost differences are attributable to the pilot, persist for 20 years, and are discounted at 7% — the analysis estimates approximately $2.95 in included community benefits for every $1 invested. At 50% crime-benefit attribution, that figure falls to approximately $1.47 per $1 invested.

These figures are best understood as scenarios rather than a traditional financial return. They do not represent cash returned to the City, and the outcome changes substantially depending on assumptions about attribution, duration, maintenance, and future costs. The evaluation intentionally tests these assumptions to demonstrate both the potential value of CPTED investment and the importance of continued measurement.

The High Street case study demonstrates that CPTED can function as more than a collection of individual physical improvements. Lighting, pedestrian access, natural surveillance, neighborhood identity, landscaping, residential improvements, and community participation can work together as part of a broader strategy for how a neighborhood is used, observed, maintained, and experienced.

It also reinforces the importance of post-occupancy evaluation. The physical improvements themselves document what was built, but crime data, property assessments, environmental modeling, maintenance records, resident feedback, and other measures help determine how those investments perform after implementation. The High Street evaluation identifies encouraging safety evidence while also recognizing where additional data and continued monitoring are needed.

Ultimately, the High Street CPTED Pilot provides a useful example for CPTED practitioners, public agencies, designers, and communities considering neighborhood-scale investments. The project demonstrates how CPTED principles can be integrated with infrastructure, environmental improvements, and community stewardship — and why evaluating those investments over time is an important part of understanding their long-term performance.

40.3% Lower Serious Reported Crime

90 New Street Trees Planted

$2.95 Community Value per $1 Invested

James A. Bland Playground Case Study

Have a CPTED project you’d like to share?

The US CPTED Association is building a growing library of real-world case studies that highlight innovative projects, measurable outcomes, and lessons learned. If you’ve completed a CPTED project involving parks, schools, neighborhoods, commercial properties, public spaces, or other environments, we’d love to hear your story and explore featuring it as part of our Case Study Library.